Cookie Notice

This website uses its own operating cookies and analytical cookies from Google.
You can accept or configure them in the link that appears below.

Configure
Accept
References
Success stories
Grape Must Desulphitation
Customer: CRA (Albacete)
Year: 2015
Features

Installation for the desulphitation of grape must, with a capacity of 2.500 kg/h, prepared to double its treatment capacity. Guaranteeing a low content in the desulphited must. It includes a constitution water recovery unit, as well as an air-washing column with neutralization system. This implies a facility with zero effluent discharge or polluting emissions.

More info …